스킵네비게이션

Eco-Friendly Ship Retrofit

Based on over 40 years of experience and know-how from HD Hyundai Heavy Industries, turnkey construction is carried out from design, installation, and commissioning to achieve customer satisfaction.

In response to the International Maritime Organization’s (IMO) environmental regulations, professional engineers promptly and accurately carry out retrofit work to install eco-friendly facilities such as scrubbers, BWTS, etc., through analysis, consultation, and on-site supervision.

Scrubber Retrofit Work

In partnership with major suppliers of SOx scrubbers and repair shipyards, HD Hyundai Marine Solution provides high-quality SOx scrubber retrofit services to global customers based on its experience in installation in approximately 200 different vessels.

In particular, HD Hyundai Marine Solution provides turnkey solution services, including engineering, material purchase, installation, and commissioning. HD Hyundai Marine Solution provides direct design services using the previously established database for vessels delivered by HD Hyundai. HD Hyundai Marine Solution also has standard drawings for vessels built by other shipyards as well to promote customer convenience.

HD Hyundai Marine Solution’s solid network in Korea and across the world provides total service packages related to the SOx scrubbers, including warranty, repair, supply, and training anywhere and anytime.

BWTS Retrofit Work

HD Hyundai Marine Solution provides the Ballast Water Treatment System (BWTS) retrofit service to vessels in service that are in line with the regulations of the IMO Ballast Water Management Convention and the United States Coast Guard (USCG) regulations.

HD Hyundai Marine Solution has a history of supplying and installing various types of BWTSs, including HiBallast (indirect electrolysis type system) developed and produced by HD Hyundai Heavy Industries, as well as the direct electrolysis type system, and ultraviolet sterilization type system.

We recently developed a filter-free BWTS (HiBallast NF), which received positive feedback from customers by dramatically improving the BWTS price competitiveness and equipment operation efficiency. HD Hyundai Marine Solution provides an integrated solution for BWTS retrofit work that customers can trust and be satisfied with.

BWTS Brochure
  1. Engineering review (Arrangement/P&ID) : 1Week
  2. Onboard Survey (3D Scanning) : 1-2Week
  3. Technical Proposal/Quotation : 2Week
  4. Contract : 3Week
  5. Drawing review (Approval by Owner/Class) : 4-8Week
  6. BWTS/Sub-materials Fabrication : 4-21Week
  7. Installation Procedure review : 5-22Week
  8. Factory Inspection (FAT) : 22Week
  9. Shipping and loading : 23-25Week
  10. Installation on board : 25-26Week
  11. Commissioning : 27Week